PDF document
- 1 -
                                                                                                                         Reset Form
Form 80-315-22-8-1-000 (Rev. 10/22)
                                                                 Mississippi                                             Print Form
                                                       Reforestation Tax Credit
                                                                       2022                             SSN
Taxpayer Name                                                                                           FEIN

  PART I:  COMPUTATION OF REFORESTATION TAX CREDIT (RTC)

1    Total expenditures during the year 2022 for seedlings, seed/acorns, seeding, planting by hand or machine,           
      site preparation and post-planting site preparation on all eligible acres                                          1                                    00
                                                                                                                                                             .
2    Total cost of approved practices as established by the Mississippi Forestry Commission (complete the 
       worksheet on the reverse side of this form and enter the total from column C here)                                2                                    00
                                                                                                                                                             .
3    Eligible costs (enter lesser of line 1 or line 2)                                                                   3                                   .00
4    Enter 50% of amount in line 3 above or $10,000 whichever is less; this is your RTC earned this year                 4                                   .00
5a  Enter the amount of RTC carried over from earlier years (attach Form 80-315 for immediate prior year)                5a                                  .00
5b  Enter the current year RTC passed through to you as an investor in a pass-through entity (see K-1 forms)             5b                                  .00
6    Total Amount of RTC available to be utilized this year (pass-through entities only; add line 4, line 5a and  
   line 5b; do not enter an amount larger than amount on line 16, Part IV below; enter the amount on                     6                                   .00
      Form 84-401 and skip Part II and Part III below)
Was either of the following elected on your Federal income tax return with respect to the qualifying expenditures on the same eligible lands  
on which the RTC is claimed:     Investment tax credit     Yes               No                        Reforestation amortization     Yes               No   

  PART II:  REFORESTATION TAX CREDIT UTILIZED THIS YEAR
(NOTE: When married taxpayers file jointly and each spouse qualifies as an eligible owner, see instructions for completion of lines 7 and 8)
7    Enter the amount of total income tax due shown on line 17, Form 80-105 and line 20, Form 80-205 (individuals); 
      line 6, Form 83-105 (corporations) or line 2, Form 81-110 (fiduciary return)                                       7                                    00
                                                                                                                                                             .
8    Enter the total amount of all other credit(s) available to you this year (refer to the instructions for the return 
      you are filing for a list of available credits); do not include withholding or estimated tax payments              8                                    00
                                                                                                                                                             .
9    Net income tax due (line 7 minus line 8)                                                                            9                                   .00
10  Reforestation tax credit (enter LESSER of line 6 or line 9 here and Form 80-401 or 83-401)                           10                                  .00

  PART III:  COMPUTATION OF REFORESTATION TAX CREDIT CARRYOVER AMOUNT

11  Total reforestation tax credit available to be utilized this year (amount from line 6 above)                         11                                  .00
12  Amount of RTC utilized this year (amount from line 10 above)                                                         12                                  .00
13  Amount of RTC available to be carried forward and used in succeeding tax years (line 11 minus line 12)               13                                  .00

  PART IV:  COMPUTATION OF ACCUMULATED REFORESTATION TAX CREDIT LIFETIME CREDIT UTILIZIED

14  LIFETIME REFORESTATION TAX CREDIT ALLOWANCE                                                                          14        7  5,  0  0  0            .00
15  Total RTC utilized in prior years to offset income tax due (total of amounts shown on Line 12, Part III, Form 
   80-315) for all prior years; pass-through entities enter total RTC passed through to investors in ALL prior years     15                                   00
                                                                                                                                                             .
16   Balance of lifetime RTC allowance available to be used (line 14 minus line 15; for pass-through entities, this is
       the balance of your lifetime RTC allowance which is available to be passed through to investors)                  16                                   00
                                                                                                                                                             .
  PART V:  CERTIFICATION OF FORESTER

In accordance with Miss. Code Ann. Section 27-7-22.15, I certify that a reforestation prescription or plan as indicated above for eligible lands owned by
                                                         ,             a graduate forester of a college, school or university accredited by the Society
of American Foresters or              a registered forester under the Foresters Registration Law of 1977; and that the reforestation practices below have
been completed and that the reforestation prescription or plan was followed. 

   Site preparation                                    Cost of seedlings and/or seed/acorns
   Planting by hand or machine and/or seeding          Post-planting site preparation practices

   Signature                                           Title                                                Date

   Business Address                                                                                         Identifying Number



- 2 -
Form 80-315-22-8-2-000 (Rev. 10/22)

                                          Mississippi
                                                                                                                                     Page 2
                                          Reforestation Tax Credit
                                          Cost Worksheet
SSN                                                                                   FEIN
                                          2022
Please enter the name and/or county code for the county, or counties, in which the activities listed below were performed. The county codes 
are shown in the table included in your income tax instruction booklet.

County:
                                   Code                                          Code                                                Code
I. Regeneration

                                          Column A                                    Column B               Column C 
                                          COST SUMMARY PER ACRE                  NUMBER OF ACRES             EXTENDED COST 
                                                                                                             (Col. A x Col. B)
Tree Planting (1)
Pine
Seedlings / Bare Root                     54.00                                                                                            .00
Labor                                     60.00                                                                                            .00
Containerized Longleaf
Seedlings                                 88.00                                                                                            .00
Labor                                     81.00                                                                                            .00
Containerized Loblolly or Slash
Seedlings                                 70.00                                                                                            .00
Labor                                     60.00                                                                                            .00
Hardwood
Seedlings                                 115.00                                                                                           .00
Labor                                     85.00                                                                                            .00

Mixed Stand Regeneration
Seedlings                                 37.00                                                                                            .00
Labor                                     33.00                                                                                            .00
Site-Preparation                          125.00                                                                                           .00
Natural Regeneration
Site-Preparation                          100.00                                                                                           .00

II. Site-Preparation

Chemical                                  100.00                                                                                           .00
Mechanical                                190.00                                                                                           .00
Bush Hog                                  40.00                                                                                            .00
Post Planting Site-Preparation (2)        75.00                                                                                            .00
Sub-Soil                                  45.00                                                                                            .00
Site-Preparation Burn                     38.00                                                                                            .00

TOTAL  (Enter the total of Column C here and on page 1, Part I, line 2)                                                                    .00

Footnotes:       (1) Includes cost of seedlings and planting by hand or machine  
                 (2) Reduction and control of undesirable competition within the first growing season of an established crop of trees

                                   NOTICE:  A copy of the above worksheet MUST be furnished to:  
                                   Mississippi Forestry Commission 660 North St. Suite 300, Jackson, MS 39202






PDF file checksum: 901527481

(Plugin #1/9.12/13.0)